Bio-rad S3™ Cell Sorter Manual do Utilizador Página 114

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 113
104 | S3 and S3e Cell Sorters
Maintenance
After the AutoGimbal system has completed its alignment and found the most optimal position,
system calibration and drop delay calculation will begin automatically.
39. Select the bead lot from the dropdown menu and click the checkmark (Figure 126).
40. Load 500 µl ProLine
Universal Calibration or ProLine Calibration Beads into a 5 ml tube
and place into the sample station.
41. Move the loading stage into running position.
Fig. 126. Calibration Bead selection window.
Fig. 125. Automated alignment process windows.
Fig. 127. Automatic Tip Swap window.
Vista de página 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 131 132

Comentários a estes Manuais

Sem comentários