Bio-rad ChromLab™ Software Manual do Utilizador Página 270

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 306
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 269
C | Plumbing the System
268 | NGC Chromatography Systems and ChromLab Software
8. Attach a 30 ml syringe to the 1/4-28 female to male luer adaptor.
9. Withdraw the plunger on the syringe until liquid is visible in the syringe.
10. Detach the luer adaptor and syringe from the pump head wash priming tubing
on pump B.
11. Locate the second inlet tubing with the 1/4-28 union that you set aside in
step 7.
12. Connect the union to the pump head wash priming tubing on system pump B.
13. Immerse the other end of the inlet tubing in the tube of 20% IPA.
To plumb the sample pump
Perform the steps in the section To plumb and prime the system pump wash lines
on page 267 with the following exception:
Attach the inlet tubing to the left rear port on the sample pump, and the pump
head wash priming tubing to the right rear port.
Vista de página 269
1 2 ... 265 266 267 268 269 270 271 272 273 274 275 ... 305 306

Comentários a estes Manuais

Sem comentários