Bio-rad ChromLab™ Software Manual do Utilizador Página 99

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 306
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 98
Preparing the Detectors
Instrument Guide | 9 7
4. Connect the tubing to the check valves.
Preparing the Detectors
The NGC systems ship with the conductivity monitor and the UV detectors installed,
calibrated, and ready for use. These modules require no preparation.
The pH module (if installed) requires you to install and calibrate the pH probe. See
the section Replacing the pH Probe on page 218 for information about installing a
new pH probe.
UV Lamps
The UV detector ships with the UV lamps installed. When the instrument starts, the
lamps turn on.
Vista de página 98
1 2 ... 94 95 96 97 98 99 100 101 102 103 104 ... 305 306

Comentários a estes Manuais

Sem comentários