Bio-rad ChromLab™ Software Manual do Utilizador Página 106

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 105
5 | Plumbing and Priming the NGC Chromatography Systems
104 | NGC Chromatography Systems and ChromLab Software
Plumbing the Sample Inject Valve
To plumb the sample inject valve
1. Connect waste tubing to waste ports Waste 1 and Waste 2 on the sample inject
valve.
2. Connect an injection port to the center of the sample inject valve.
3. Connect the sample loop to ports Loop E and Loop F on the inject valve.
Vista de página 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 177 178

Comentários a estes Manuais

Sem comentários