Bio-rad ChromLab™ Software Manual do Utilizador Página 137

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 136
Priming and Purging the System
Installation Guide | 135
9. Repeat steps 4–8 for the remaining buffer inlet ports.
10. To prime buffer inlet valve B, select buffer B1 and perform steps 3–9 on system
pump B.
To prime the sample pump
1. Immerse the inlet tubing for the sample pump in the appropriate container.
2. Insert a 30 ml syringe into the priming port.
3. Turn the priming port valve counter
-clockwise one full turn to open the seal.
4. Slowly withdraw the
plunger to withdraw liquid from the port
until
air no
longer enters the syringe (approximately 10 ml)
and all tubing is filled with
liquid.
5. Turn the priming port valve clockwise to close the port.
6. Remove the syringe from the priming port and discard the liquid into waste.
Vista de página 136
1 2 ... 132 133 134 135 136 137 138 139 140 141 142 ... 177 178

Comentários a estes Manuais

Sem comentários