Bio-rad ChromLab™ Software Manual do Utilizador Página 132

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 131
5 | Plumbing and Priming the NGC Chromatography Systems
130 | NGC Chromatography Systems and ChromLab Software
3. To purge all lines of air bubbles and fill them with buffer:
a. Click All.
b. (Optional) Change the default flow rate.
The default flow rate is set to 20 ml/min.
c. Click Start.
The system pumps and the buffer blending valve start operating at the
specified flow rate, exchanging the solution in the inlet lines and expelling any
trapped bubbles, cycling sequentially thr
ough the ports Q1 to Q4. After the
specified duration, the pumps stop momentarily while the blending valve
switches to port Q3 in order to flush the lines with water before closing the
valve. No change is allowed during this process for the specified duration.
Note: You can stop the cycle before it completes by clicking Stop. In this
case, ensur
e that all buffer lines are filled with the appropriate buffers
before continuing.
Vista de página 131
1 2 ... 127 128 129 130 131 132 133 134 135 136 137 ... 177 178

Comentários a estes Manuais

Sem comentários